PROJECT: Subdivision
![]() | ![]() | ![]() |
---|---|---|
![]() | ![]() | ![]() |
![]() |
Year: 2016
Project Name: Four lot sub-division
Company: Private
Duration: 4 Weeks
Briefing:
Sub Division.
This project involved subdividing a property into four different Lots. The property was de-grassed and material was imported to get the required heights for each of the four lots.
Retaining walls, driveways, crossovers, stormwater systems, post holes and footpaths were also constructed before the handover of the project.
We turned this project around in under four weeks. All materials used were sourced from sustainable vendors where possible. All exported spoil, (concrete, timber and soils), were separated and disposed of through recycling facilities.